Backed by

Plan every heat, caster, and rolling line — AI production planning built for steel

Harumi uses Operations Research and AI to sequence melt shops, casters, and rolling mills — cutting delays, reducing changeovers, and hitting due dates across your steelworks.

Already optimizing with Harumi

  • KPMG logo
  • KPMG logo

Built for steel

Planning built for the realities of steelmaking

From the melt shop to finishing, steel plants juggle heats, grades, widths, and tight delivery windows. Harumi turns that complexity into an optimized, executable plan.

Heat & caster sequencing

Sequence charges, heats, and continuous casting to minimize transitions and protect throughput across the melt shop.

Hot & cold rolling campaigns

Build rolling campaigns that respect width, gauge, and grade transitions automatically — no more manual coffin scheduling.

Setup & changeover reduction

Group compatible orders to cut roll changes and setup time without pushing past customer due dates.

Due-date reliability

Promise and hit delivery dates with capacity-aware planning across casters, mills, and finishing lines.

Numbers

Your company gets the results

Tangible performance improvements backed by data. From cost reductions to productivity gains.

+94%

Production planning efficiency

We automate production planning and save your time. No more manual planning on spreadsheets.

-38%

Reduction in production delays

Ensure that your company is delivering everything on time.

-11%

Reduction in machine setup time

Get more output from the same resources by reducing setup time.

Where we help

Optimization across the whole steelworks

Harumi plugs into your ERP, MES, and spreadsheets to optimize the decisions that move tons — line by line, end to end.

01

Melt shop & caster scheduling

Optimize charge sequencing, ladle routing, and continuous casting to keep casters running and reduce energy-intensive transitions.

02

Hot strip mill campaigns

Generate rolling campaigns that honor gauge, width, and grade rules — maximizing tons rolled between roll changes.

03

Finishing & cold rolling lines

Coordinate pickling, cold rolling, annealing, and coating so downstream lines stay fed without bottlenecks.

04

Slab, coil & inventory optimization

Balance work-in-process and finished inventory across the works to free up capital while protecting service levels.

Security

Safe by Design

We are dedicated to upholding the highest global standards in security, privacy, and compliance.

ISO 20071

Harumi is ISO 27001 certified, meeting the globally recognized standard for information security management.

SOC2 Type II

Built in alignment with SOC 2 requirements to ensure secure and compliant data management across all systems.

LGPD

Compliant with Brazil’s LGPD, ensuring the protection and proper management of personal data.

Bring optimized planning to your steelworks

See how Harumi sequences heats, casters, and rolling lines to cut delays and hit due dates — on your data.

Book a demo